before I paint with my color coat? The product data says that you should recoat within 30min-1hour but does that mean to recoat with more epoxy or does it mean that it is ok to topcoat with your color?
The exact instructions:
DRYING SCHEDULE
Dry times are based on the recommended dry film thickness of 2.0 mils.
Air dry times at 75 degrees F and 50% R.H.
To Recoat 30min-1hour
Forced dry times (to tape free)
140F 30 min
160F 20 min
This is as confusing as hell to me, surely it takes longer than 30min-1hour of air dry time at 75F if you use the same time to dry at 140F-160F

Reply With Quote